Getting your home connected to V4 Consumer’s fibre network is a straightforward process, but here’s what you can expect in terms of timing:
Installation day: up to 2 hours
Engineer visit:
On the day of your installation, our engineer will need up to 2 hours to complete the connection inside your home.
This includes setting up the fibre optic cable, installing the necessary equipment, and ensuring everything is working smoothly.
Bringing fibre to your property: up to 14 days
Fibre cable installation:
Before the installation inside your home, it may take up to 14 days for our team to bring the fibre cable to your property.
This process involves running the fibre optic line from the nearest network point to your premises.
For more: https://www.v4consumer.co.uk/how-long-does-installation-take